
"Aston Hall", Frantsuzky Bulvar 60/1, Odesa. Complex implementation of main and backup power supply systems
"Aston Hall" is the first clubhouse in Ukraine with the infrastructure of a five-star hotel.
"Aston Hall" is the first clubhouse in Ukraine with the infrastructure of a five-star hotel.
Our company as a general contractor was selected to perform a set of design works within the project "CONSTRUCTION OF A NEW HEAT POWER PLANT" with a capacity of 8 MW for PJSC ADM ILLICHIVSK with the connection to the JSC Oblenergo grid.
The main and auxiliary systems of the 10MW turbine unit were integrated into the technological process of the enterprise.
The project included:
Complex turnkey project:
The project included manufacturing a set of power distribution switchboards in accordance with the requirements of the Russian Maritime Shipping Register. System type - 3-phase 4 wire insulated neutral.
The project included manufacturing electrical switchgear in accordance with the requirements of the Italian Maritime Shipping Register (Registro Italiano Navale - RINA).
The project included manufacturing a set of power distribution switchboards in accordance with requierments of the Russian Maritime Shipping Register.
The complex implementation of "turnkey" systems:
Implementation of a dispatching system with client-server architecture for 17 automated technological sections.
Implemented automatic operation of the grain complex with automated construction of technological routes
The project included the manufacture of an MCC shield with withdrawable feeder cells for powering equipment on an oil platform.
Seismic resistance of the shield - 7 points (MSK-64). The rated current of the shield is 4000A. Shield design - Okken (Schneider Electric)
Reconstruction of the oil extraction plant with an increase in processing capacity up to 1500 tons/day of sunflower seeds meant the supply of seven MCC shields to control the loads of the press, ruzhalno-vechenoe departments, as well as an MCC shield for extracting